Case Study: Sliding a Chiller Into the Second Floor of a Live Manufacturing Plant

A Honda plant in East Liberty, Ohio, needed a new, 25-ton chiller installed on the second floor of the facility. Moving the chiller to the plant was straightforward. Bay Crane, a specialized rigging and transportation company, brought the chiller to the plant on a lowboy trailer, then moved it to the entry of the plant […]
Case Study: Moving a Retired Train With Hydra-Slide Hydraulic Skidding

The Canadian Pacific Railway No. 5500 locomotive has been on display at the Revelstoke Railway Museum in British Columbia since November 2011, but years of exposure to the weather had taken a toll on the mighty engine. CPR No. 5500 owns a special place in Canadian rail history as the first of Canada’s high-horsepower diesel […]